Objective: Soil Vapor Extraction Fast Track Design Assist
Timeline: Projected duration of 10-12 weeks | Actual duration of 4 weeks
Conceptual Estimate: $500,000
Project Overview: GMC conducted design-build work for AECOM with a scope including excavation, fabrication of 1000 ft of 4 in. pipe, painting of pipe, field installation, testing, and backfill. We later continued the initial project with an installation of 5,000 ft of 4 in. pipe and 20 wells and monitoring systems.